NORPLAN Tanzania Limited

Our work

Selected projects

Assignments from across NORPLAN’s engineering divisions.

Highways & Transportation

View division ↗

Rehabilitation to bitumen standard of the T3 Central Corridor section from Lusahunga (Biharamulo) to the Rwanda border at Rusumo (Ngara) — the route linking Dar es Salaam port with Rwanda, Burundi and eastern DRC. Design review against international standards and updating · construction supervision to drawings, specifications and contract · ESHS compliance · defects liability supervision. The ESIA update to the World Bank ESF was prepared by NORPLAN. Client TANROADS · Financier World Bank · Role Design review and supervision consultant

Two-lane road widened to four lanes, including the Sinza bridge (14 m span, 30 m wide) built with two extra central lanes reserved for future rapid transit. Design review · construction supervision of the road and the Sinza bridge. Role Design review and supervision consultant

A priority link on the central corridor network, connecting Tanzania with Burundi and the DRC through Kigoma port and the border posts. Design review · tender documents, revised BoQ and confidential estimate · tendering support · supervision and monthly reporting · defects liability · as-built review and project completion report. Client TANROADS · Role Design review and supervision consultant

Widening to dual carriageways with BRT lanes, non-motorised transport facilities, accessibility provisions, intelligent traffic signals and street lighting, backed by a network-wide traffic study. Review of the detailed design and tender documents · design of the new dual carriageway · traffic study · ESIA · tender documents. Client TANROADS (HQ and Dar es Salaam) · Financier Government of Tanzania · Role Design consultant

First section of the SGR that links the port of Dar es Salaam with Mwanza and on to Rwanda, Burundi and the DRC. Borehole drilling and laboratory testing along the formation, delivered with the Geotechnical division · final report. Client Yapı Merkezi (with Mota-Engil Africa) · Role Ground investigation consultant

Design review and supervision of upgrading to bitumen, Lot 1 of Tabora–Nyahua–Chaya Client TANROADS

Administration and terminal buildings, boarding bays, bus exit bridge, parking Geotechnical investigation, detailed design, construction supervision Client Dar es Salaam City Council

Morogoro, Songea, Mbeya and Sumbawanga

TACTIC Zone 3: Morogoro, Songea, Mbeya, Sumbawanga

Central bus terminal and minibus stand on an old airport site, markets, urban infrastructure Feasibility, urban design, detailed design, ESDD, bidding documents Client PO-RALG · World Bank

Tunduma–Nakonde, Zambia

Nakonde one-stop border post

Border post buildings, parking and traffic areas at the Tunduma–Nakonde crossing Detailed design incl. ESIA (completed); design review, tender documents and supervision (from 2023) Client Zambia Revenue Authority; Trade Catalyst Africa

Phase I: 14.74 km in Musanze town and Musanze–Nyakinama; Phase II: 10 km town roads Monitoring and supervision of upgrading works

Structures & Bridges

View division ↗

Cable-stayed bridge on two reinforced concrete pylons carrying six traffic lanes and pedestrian walkways, on piles taken 40 m below the seabed, with about 3 km of approach road and smaller bridges to Mandela Road

Water & Sanitation

View division ↗

Package 1: 8 wells, 2,000 m³ reservoir, 260 m³ elevated tank, 14.6 km of mains (Welezo). Package 2: 15 wells, 12.6 km raw-water main, 2,800 m³ elevated reservoir, 154 km of distribution pipes and 7,600 connections (Migombani West). Package 3: remote monitoring of sources, reservoirs and district metered areas.

Energy & Building Services

View division ↗

1 × 20 MVA 220/33 kV substation teed off the Kihansi–Kidatu 220 kV line with SCADA integration; 70 km 33 kV line, 26 pole-mounted transformers and 128 km LV; 1,050 initial connections, since grown to 1,745 households.

Environment, Social & Safety

View division ↗

Geotechnical & Materials Testing

View division ↗

Supply base for Ophir Energy’s exploration programme and future operators: mud, bulk-mud and cement plants, a 600,000-litre water tank and drill-water piping to supply vessels, office modifications and water treatment.